Arundel
2 delay minutes
Most of the delay picked up at Arundel in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 2 | 100% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 83 |
| TG | Driver | 54 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 51 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 37 |
| XM | External utility incident including gas, water mains, overhead power lines | 32 |
| IC | Track circuit failure (including no fault found) | 27 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 24 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 21 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 19 |
| R8 | Delay at Station believed to be operator cause and information required from operator (Ops Responsibility) | 14 |