Leaves on the Line

Ardrossan South Beach

ASB Scotland route
CSV JSON

233 delay minutes

The biggest share (30%) of the delay picked up at Ardrossan South Beach in the four weeks to 9 December 2023 came from autumn leaves.

9% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2<1%8% 0 a day, the most in 5 years-
Signals, points and power4118%16% 1 a day, the most in 5 years4
Weather and structures--7% 0 a day, the least in 5 years-
Autumn6930%7% 2 a day, more than 2 of the other 4 years-
External31%4% 0 a day, more than 3 of the other 4 years-
Network management115%17% 0 a day, more than 2 of the other 4 years8
The operators' causes
Train faults146%16% 1 a day, the most in 5 years-
Traincrew136%11% 0 a day, the most in 5 years-
Stations2611%3% 1 a day, the most in 5 years-
Operations42%5% 0 a day, the least in 5 years-
Operator, other5021%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T46
MPRail / wheel interface, adhesion problems (including ice on the running rail)37
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed23
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles15
IASignal failure (including no fault found)14
TGDriver13
RQUn-booked assistance for a person with reduced mobility joining/alighting,12
M8Technical failures above the Solebar11
ICTrack circuit failure (including no fault found)10
TTLeaf fall Neutral10
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)3,499
Q3NZ Pumps T935
OCSignaller including mis-routing (not ERTM /ETCS related)632
MPRail / wheel interface, adhesion problems (including ice on the running rail)625
TGDriver538
TTLeaf fall Neutral454
RQUn-booked assistance for a person with reduced mobility joining/alighting,398
RBPassengers joining/alighting369
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail334
I8Animal Strike or Incursion within the control of Network Rail287