Ardlui
71 delay minutes
Most of the delay picked up at Ardlui in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 59 | 83% | 17% | 1 |
| The operators' causes | ||||
| Train faults | 12 | 17% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 59 |
| MD | Technical failures below the solebar | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 296 |
| RM | Waiting connections from other transport modes | 146 |
| TG | Driver | 72 |
| RK | Waiting passenger connections authorised by TOC but outwith TOC/Network Rail connection policy | 67 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 59 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 54 |
| MD | Technical failures below the solebar | 35 |
| ZU | No Cause Identified After investigation by both Parties | 31 |
| I0 | Telecom equipment legacy radio failures (RETB) | 25 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 25 |