Barnham
1,703 delay minutes
The biggest share (35%) of the delay picked up at Barnham in the four weeks to 9 December 2023 came from signal, points and power faults.
69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 71 | 4% | 8% | 3 a day, more than 1 of the other 4 years | 2 |
| Signals, points and power | 592 | 35% | 16% | 21 a day, more than 3 of the other 4 years | 21 |
| Weather and structures | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 192 | 11% | 4% | 7 a day, the most in 5 years | 10 |
| Network management | 415 | 24% | 17% | 15 a day, more than 1 of the other 4 years | 9 |
| The operators' causes | |||||
| Train faults | 139 | 8% | 16% | 5 a day, the least in 5 years | 6 |
| Traincrew | 187 | 11% | 11% | 7 a day, the least in 5 years | 4 |
| Stations | 31 | 2% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 53 | 3% | 5% | 2 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 18 | 1% | 7% | 1 a day, the least in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 283 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 147 |
| TG | Driver | 143 |
| II | Signalling lineside cable fault | 141 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 126 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 98 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 88 |
| M8 | Technical failures above the Solebar | 50 |
| IA | Signal failure (including no fault found) | 47 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 43 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 15,188 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 7,279 |
| TI | Traincrew rostering problem | 6,234 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 6,013 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,268 |
| IC | Track circuit failure (including no fault found) | 3,705 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,576 |
| M8 | Technical failures above the Solebar | 3,124 |
| IB | Points failure (including no fault found) | 3,114 |
| II | Signalling lineside cable fault | 2,680 |