Leaves on the Line

Barnham

BAA Sussex route
CSV JSON

1,703 delay minutes

The biggest share (35%) of the delay picked up at Barnham in the four weeks to 9 December 2023 came from signal, points and power faults.

69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track714%8% 3 a day, more than 1 of the other 4 years2
Signals, points and power59235%16% 21 a day, more than 3 of the other 4 years21
Weather and structures3<1%7% 0 a day, the least in 5 years-
Autumn3<1%7% 0 a day, the least in 5 years-
External19211%4% 7 a day, the most in 5 years10
Network management41524%17% 15 a day, more than 1 of the other 4 years9
The operators' causes
Train faults1398%16% 5 a day, the least in 5 years6
Traincrew18711%11% 7 a day, the least in 5 years4
Stations312%3% 1 a day, more than 3 of the other 4 years-
Operations533%5% 2 a day, more than 3 of the other 4 years2
Operator, other181%7% 1 a day, the least in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)283
OCSignaller including mis-routing (not ERTM /ETCS related)147
TGDriver143
IISignalling lineside cable fault141
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)126
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)98
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)88
M8Technical failures above the Solebar50
IASignal failure (including no fault found)47
IRBroken/cracked/twisted/buckled/flawed rail43
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver15,188
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,279
TITraincrew rostering problem6,234
OCSignaller including mis-routing (not ERTM /ETCS related)6,013
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,268
ICTrack circuit failure (including no fault found)3,705
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,576
M8Technical failures above the Solebar3,124
IBPoints failure (including no fault found)3,114
IISignalling lineside cable fault2,680