Balcombe
12 delay minutes
Most of the delay picked up at Balcombe in the four weeks to 9 December 2023 came from traincrew problems.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 12 | 100% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TI | Traincrew rostering problem | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 102 |
| TI | Traincrew rostering problem | 101 |
| M8 | Technical failures above the Solebar | 43 |
| MU | Depot operating problem | 39 |
| TZ | Other Passenger Train Operating Company causes | 38 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 26 |
| XP | BRIDGE HIT | 17 |
| I1 | Overhead line/third rail defect | 17 |
| M9 | Reported fleet equipment defect - no fault found | 15 |
| II | Signalling lineside cable fault | 15 |