Leaves on the Line

Battersea Park

BAK Sussex route
CSV JSON

468 delay minutes

The biggest share (33%) of the delay picked up at Battersea Park in the four weeks to 9 December 2023 came from how the network was run.

67% of these minutes were knock-on from something that happened elsewhere first. 74% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track204%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power409%16% 1 a day, more than 1 of the other 4 years3
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External4<1%4% 0 a day, more than 1 of the other 4 years-
Network management15433%17% 6 a day, more than 1 of the other 4 years1
The operators' causes
Train faults15433%16% 6 a day, more than 2 of the other 4 years7
Traincrew235%11% 1 a day, the least in 5 years1
Stations204%3% 1 a day, more than 2 of the other 4 years1
Operations133%5% 0 a day, the least in 5 years-
Operator, other409%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar62
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)62
MQConfirmed shoe beam or associated system faults Incl. train borne power switch over systems (DC)44
VHPassenger Communication cord, door egress or emergency train alarm operated40
OCSignaller including mis-routing (not ERTM /ETCS related)38
OBDelayed by signaller not applying applicable regulating policy30
TGDriver18
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)16
I1Overhead line/third rail defect15
IRBroken/cracked/twisted/buckled/flawed rail14
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)8,161
TGDriver8,104
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,874
ICTrack circuit failure (including no fault found)2,867
OCSignaller including mis-routing (not ERTM /ETCS related)2,678
TITraincrew rostering problem2,594
OBDelayed by signaller not applying applicable regulating policy2,395
VHPassenger Communication cord, door egress or emergency train alarm operated2,180
M8Technical failures above the Solebar2,041
IBPoints failure (including no fault found)1,539