Leaves on the Line

Baldock

BDK East Coast route
CSV JSON

4 delay minutes

Most of the delay picked up at Baldock in the four weeks to 9 December 2023 came from traincrew problems.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew4100%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver4
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver346
TITraincrew rostering problem186
TZOther Passenger Train Operating Company causes131
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)128
M8Technical failures above the Solebar114
MDTechnical failures below the solebar102
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.89
ICTrack circuit failure (including no fault found)87
MUDepot operating problem87
IASignal failure (including no fault found)79