Blaenau Ffestiniog
695 delay minutes
The biggest share (34%) of the delay picked up at Blaenau Ffestiniog in the four weeks to 9 December 2023 came from traincrew problems.
44% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 21 | 3% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | 76 | 11% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 26 | 4% | 7% | 1 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 10 | 1% | 17% | 0 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 87 | 13% | 16% | 3 a day, more than 3 of the other 4 years | 9 |
| Traincrew | 238 | 34% | 11% | 9 a day, more than 3 of the other 4 years | 1 |
| Stations | 153 | 22% | 3% | 5 a day, the most in 5 years | - |
| Operations | 66 | 9% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 19 | 3% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 153 |
| TG | Driver | 149 |
| TH | (Senior) Conductor/Train Manager | 77 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 76 |
| TZ | Other Passenger Train Operating Company causes | 66 |
| M7 | Door and Door system faults | 44 |
| Q3 | NZ Pumps T | 17 |
| TT | Leaf fall Neutral | 17 |
| M2 | Delay due to ATO / ETCS equipment | 13 |
| TW | Driver adhering to company professional driving standards or policy | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 2,510 |
| TG | Driver | 1,400 |
| TH | (Senior) Conductor/Train Manager | 1,115 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,087 |
| TZ | Other Passenger Train Operating Company causes | 678 |
| MD | Technical failures below the solebar | 447 |
| OU | Delays not Investigated by Network Rail | 409 |
| ZY | Univestigated station overtime System Roll-up Only | 296 |
| M8 | Technical failures above the Solebar | 292 |
| M7 | Door and Door system faults | 273 |