Bridgend
3,444 delay minutes
The biggest share (25%) of the delay picked up at Bridgend in the four weeks to 9 December 2023 came from faulty trains.
54% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 515 | 15% | 8% | 18 a day, the most in 5 years | - |
| Signals, points and power | 363 | 11% | 16% | 13 a day, the most in 5 years | - |
| Weather and structures | 28 | <1% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 60 | 2% | 7% | 2 a day, the most in 5 years | - |
| External | 91 | 3% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 389 | 11% | 17% | 14 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 868 | 25% | 16% | 31 a day, more than 3 of the other 4 years | 9 |
| Traincrew | 507 | 15% | 11% | 18 a day, the most in 5 years | 3 |
| Stations | 324 | 9% | 3% | 12 a day, the most in 5 years | - |
| Operations | 208 | 6% | 5% | 7 a day, more than 2 of the other 4 years | - |
| Operator, other | 92 | 3% | 7% | 3 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 420 |
| M8 | Technical failures above the Solebar | 251 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 246 |
| TG | Driver | 237 |
| T2 | Delay at unstaffed station to non-DOO train | 210 |
| IC | Track circuit failure (including no fault found) | 195 |
| TZ | Other Passenger Train Operating Company causes | 152 |
| MC | Diesel Loco failure, defect, attention | 151 |
| TH | (Senior) Conductor/Train Manager | 95 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 84 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 22,133 |
| T2 | Delay at unstaffed station to non-DOO train | 6,135 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 5,928 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 5,745 |
| MD | Technical failures below the solebar | 5,570 |
| TG | Driver | 5,453 |
| TH | (Senior) Conductor/Train Manager | 4,670 |
| M8 | Technical failures above the Solebar | 4,351 |
| OU | Delays not Investigated by Network Rail | 3,752 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,382 |