862 delay minutes

The biggest share (28%) of the delay picked up at Balloch in the four weeks to 9 December 2023 came from autumn leaves.

90% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track597%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power455%16% 2 a day, the least in 5 years7
Weather and structures4<1%7% 0 a day, the least in 5 years2
Autumn24328%7% 9 a day, more than 3 of the other 4 years-
External415%4% 1 a day, more than 3 of the other 4 years-
Network management829%17% 3 a day, the least in 5 years-
The operators' causes
Train faults9010%16% 3 a day, the least in 5 years3
Traincrew809%11% 3 a day, more than 2 of the other 4 years1
Stations91%3% 0 a day, the least in 5 years-
Operations182%5% 1 a day, the least in 5 years-
Operator, other19322%7% 7 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T169
MPRail / wheel interface, adhesion problems (including ice on the running rail)128
TGDriver80
TTLeaf fall Neutral41
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed40
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure36
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)33
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.31
JBReactionary Delay to 'P' coded TSRs28
MNBrake and brake systems faults; including wheel flats where no other cause had been identified28
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)4,782
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)4,035
TGDriver3,391
JBReactionary Delay to 'P' coded TSRs2,398
Q3NZ Pumps T1,843
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,780
M8Technical failures above the Solebar1,470
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure840
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.835
M7Door and Door system faults834