Balloch
862 delay minutes
The biggest share (28%) of the delay picked up at Balloch in the four weeks to 9 December 2023 came from autumn leaves.
90% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 59 | 7% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 45 | 5% | 16% | 2 a day, the least in 5 years | 7 |
| Weather and structures | 4 | <1% | 7% | 0 a day, the least in 5 years | 2 |
| Autumn | 243 | 28% | 7% | 9 a day, more than 3 of the other 4 years | - |
| External | 41 | 5% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 82 | 9% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 90 | 10% | 16% | 3 a day, the least in 5 years | 3 |
| Traincrew | 80 | 9% | 11% | 3 a day, more than 2 of the other 4 years | 1 |
| Stations | 9 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 18 | 2% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 193 | 22% | 7% | 7 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 169 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 128 |
| TG | Driver | 80 |
| TT | Leaf fall Neutral | 41 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 40 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 36 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 33 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 31 |
| JB | Reactionary Delay to 'P' coded TSRs | 28 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 4,782 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 4,035 |
| TG | Driver | 3,391 |
| JB | Reactionary Delay to 'P' coded TSRs | 2,398 |
| Q3 | NZ Pumps T | 1,843 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,780 |
| M8 | Technical failures above the Solebar | 1,470 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 840 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 835 |
| M7 | Door and Door system faults | 834 |