Bathgate
406 delay minutes
The biggest share (29%) of the delay picked up at Bathgate in the four weeks to 9 December 2023 came from other operator causes.
46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 11 | 3% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 60 | 15% | 16% | 2 a day, more than 1 of the other 4 years | 12 |
| Weather and structures | 13 | 3% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 75 | 18% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 6 | 1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 24 | 6% | 17% | 1 a day, more than 1 of the other 4 years | 5 |
| The operators' causes | |||||
| Train faults | 49 | 12% | 16% | 2 a day, the least in 5 years | 6 |
| Traincrew | 45 | 11% | 11% | 2 a day, more than 2 of the other 4 years | 1 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 3 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 117 | 29% | 7% | 4 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 62 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 58 |
| IB | Points failure (including no fault found) | 44 |
| TG | Driver | 43 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 39 |
| M8 | Technical failures above the Solebar | 26 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 11 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 10 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,646 |
| TG | Driver | 2,252 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 2,049 |
| M8 | Technical failures above the Solebar | 1,710 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,249 |
| IB | Points failure (including no fault found) | 958 |
| Q3 | NZ Pumps T | 908 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 799 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 786 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 666 |