406 delay minutes

The biggest share (29%) of the delay picked up at Bathgate in the four weeks to 9 December 2023 came from other operator causes.

46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track113%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power6015%16% 2 a day, more than 1 of the other 4 years12
Weather and structures133%7% 0 a day, the least in 5 years-
Autumn7518%7% 3 a day, more than 3 of the other 4 years-
External61%4% 0 a day, the least in 5 years-
Network management246%17% 1 a day, more than 1 of the other 4 years5
The operators' causes
Train faults4912%16% 2 a day, the least in 5 years6
Traincrew4511%11% 2 a day, more than 2 of the other 4 years1
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations3<1%5% 0 a day, the least in 5 years-
Operator, other11729%7% 4 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T62
MPRail / wheel interface, adhesion problems (including ice on the running rail)58
IBPoints failure (including no fault found)44
TGDriver43
VHPassenger Communication cord, door egress or emergency train alarm operated39
M8Technical failures above the Solebar26
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions11
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure10
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions10
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,646
TGDriver2,252
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure2,049
M8Technical failures above the Solebar1,710
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,249
IBPoints failure (including no fault found)958
Q3NZ Pumps T908
MPRail / wheel interface, adhesion problems (including ice on the running rail)799
MNBrake and brake systems faults; including wheel flats where no other cause had been identified786
IRBroken/cracked/twisted/buckled/flawed rail666