Bellgrove
122 delay minutes
The biggest share (33%) of the delay picked up at Bellgrove in the four weeks to 9 December 2023 came from autumn leaves.
58% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 3% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 3 | 2% | 16% | 0 a day, the least in 5 years | 1 |
| Weather and structures | 3 | 2% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 40 | 33% | 7% | 1 a day, the most in 5 years | - |
| External | 4 | 3% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 32 | 26% | 17% | 1 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 3 | 2% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 8 | 7% | 11% | 0 a day, more than 3 of the other 4 years | - |
| Stations | 3 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 1 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 21 | 17% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 21 |
| OM | Technical failure associated with a Railhead conditioning train | 16 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 11 |
| Q3 | NZ Pumps T | 9 |
| QH | Adhesion problems due to leaf contamination | 8 |
| TG | Driver | 8 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 8 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 8 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 5 |
| VB | Vandalism or theft | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 640 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 589 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 581 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 569 |
| M8 | Technical failures above the Solebar | 522 |
| TG | Driver | 488 |
| IB | Points failure (including no fault found) | 428 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 413 |
| M7 | Door and Door system faults | 346 |
| IC | Track circuit failure (including no fault found) | 342 |