Belmont
6 delay minutes
Most of the delay picked up at Belmont in the four weeks to 9 December 2023 came from signal, points and power faults.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 6 | 100% | 16% | 1 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J0 | Telecom equipment radio failure (GSM-R) | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 49 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 24 |
| IC | Track circuit failure (including no fault found) | 17 |
| M7 | Door and Door system faults | 15 |
| IE | Signalling Functional Power Supply Failure | 14 |
| TI | Traincrew rostering problem | 11 |
| I9 | Fires starting on Network Rail Infrastructure | 11 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 11 |
| MD | Technical failures below the solebar | 10 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 10 |