1,172 delay minutes

The biggest share (49%) of the delay picked up at Bangor (Gwynedd) in the four weeks to 9 December 2023 came from how the network was run.

25% of these minutes were knock-on from something that happened elsewhere first. 61% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power454%16% 2 a day, more than 2 of the other 4 years-
Weather and structures4<1%7% 0 a day, the least in 5 years-
Autumn14412%7% 5 a day, the most in 5 years2
External--4% 0 a day, the least in 5 years-
Network management57549%17% 21 a day, more than 3 of the other 4 years1
The operators' causes
Train faults17515%16% 6 a day, more than 2 of the other 4 years3
Traincrew535%11% 2 a day, more than 1 of the other 4 years1
Stations141%3% 1 a day, the least in 5 years-
Operations292%5% 1 a day, more than 1 of the other 4 years-
Operator, other13411%7% 5 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)421
Q3NZ Pumps T134
TTLeaf fall Neutral134
M9Reported fleet equipment defect - no fault found59
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)56
M8Technical failures above the Solebar44
MDTechnical failures below the solebar39
TGDriver35
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)32
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps26
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3,769
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)3,640
T2Delay at unstaffed station to non-DOO train3,353
TGDriver2,252
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,983
MDTechnical failures below the solebar1,750
IHPower Supply And Distribution System Failure1,616
OUDelays not Investigated by Network Rail1,498
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,471
M8Technical failures above the Solebar1,324