Bangor (Gwynedd)
1,172 delay minutes
The biggest share (49%) of the delay picked up at Bangor (Gwynedd) in the four weeks to 9 December 2023 came from how the network was run.
25% of these minutes were knock-on from something that happened elsewhere first. 61% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 45 | 4% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 144 | 12% | 7% | 5 a day, the most in 5 years | 2 |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 575 | 49% | 17% | 21 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 175 | 15% | 16% | 6 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 53 | 5% | 11% | 2 a day, more than 1 of the other 4 years | 1 |
| Stations | 14 | 1% | 3% | 1 a day, the least in 5 years | - |
| Operations | 29 | 2% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 134 | 11% | 7% | 5 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 421 |
| Q3 | NZ Pumps T | 134 |
| TT | Leaf fall Neutral | 134 |
| M9 | Reported fleet equipment defect - no fault found | 59 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 56 |
| M8 | Technical failures above the Solebar | 44 |
| MD | Technical failures below the solebar | 39 |
| TG | Driver | 35 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 32 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 26 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,769 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 3,640 |
| T2 | Delay at unstaffed station to non-DOO train | 3,353 |
| TG | Driver | 2,252 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,983 |
| MD | Technical failures below the solebar | 1,750 |
| IH | Power Supply And Distribution System Failure | 1,616 |
| OU | Delays not Investigated by Network Rail | 1,498 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,471 |
| M8 | Technical failures above the Solebar | 1,324 |