91 delay minutes

The biggest share (34%) of the delay picked up at Brora in the four weeks to 9 December 2023 came from track faults.

32% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track3134%8%-
Signals, points and power1314%16%-
Weather and structures22%7%-
Autumn--7%-
External--4%-
Network management1112%17%-
The operators' causes
Train faults2730%16%-
Traincrew78%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.31
MDTechnical failures below the solebar22
ICTrack circuit failure (including no fault found)7
TGDriver7
IESignalling Functional Power Supply Failure6
ZUNo Cause Identified After investigation by both Parties6
M0Confirmed train cab based safety system fault (including GSMR)5
Q1Takeback Pumps5
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)2
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar493
IBPoints failure (including no fault found)305
ZUNo Cause Identified After investigation by both Parties265
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions210
TGDriver144
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail137
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles136
I0Telecom equipment legacy radio failures (RETB)136
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure119
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)102