Barmouth
27 delay minutes
Most of the delay picked up at Barmouth in the four weeks to 9 December 2023 came from how the network was run.
19% of these minutes were knock-on from something that happened elsewhere first. 52% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 22 | 81% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 5 | 19% | 16% | 0 a day, the most in 5 years | 1 |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 22 |
| M8 | Technical failures above the Solebar | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 2,653 |
| T2 | Delay at unstaffed station to non-DOO train | 1,554 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 618 |
| TZ | Other Passenger Train Operating Company causes | 429 |
| J0 | Telecom equipment radio failure (GSM-R) | 311 |
| TH | (Senior) Conductor/Train Manager | 287 |
| M8 | Technical failures above the Solebar | 285 |
| OZ | Other Network Rail operating causes | 270 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 255 |
| TG | Driver | 224 |