Leaves on the Line

Barmouth

BRM Wales route
CSV JSON

27 delay minutes

Most of the delay picked up at Barmouth in the four weeks to 9 December 2023 came from how the network was run.

19% of these minutes were knock-on from something that happened elsewhere first. 52% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management2281%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults519%16% 0 a day, the most in 5 years1
Traincrew--11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)22
M8Technical failures above the Solebar5
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)2,653
T2Delay at unstaffed station to non-DOO train1,554
M0Confirmed train cab based safety system fault (including GSMR)618
TZOther Passenger Train Operating Company causes429
J0Telecom equipment radio failure (GSM-R)311
TH(Senior) Conductor/Train Manager287
M8Technical failures above the Solebar285
OZOther Network Rail operating causes270
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure255
TGDriver224