Leaves on the Line

Barrhead

BRR Scotland route
CSV JSON

846 delay minutes

The biggest share (36%) of the delay picked up at Barrhead in the four weeks to 9 December 2023 came from how the network was run.

70% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power445%16% 2 a day, the least in 5 years-
Weather and structures13616%7% 5 a day, the most in 5 years2
Autumn192%7% 1 a day, the least in 5 years-
External415%4% 1 a day, more than 3 of the other 4 years3
Network management30436%17% 11 a day, more than 3 of the other 4 years1
The operators' causes
Train faults11914%16% 4 a day, more than 2 of the other 4 years2
Traincrew607%11% 2 a day, more than 2 of the other 4 years1
Stations496%3% 2 a day, more than 3 of the other 4 years-
Operations354%5% 1 a day, more than 3 of the other 4 years-
Operator, other415%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties178
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions68
MDTechnical failures below the solebar54
JKFlooding not due to exceptional weather47
RQUn-booked assistance for a person with reduced mobility joining/alighting,45
XPBRIDGE HIT41
TGDriver40
J5Infrastructure Asset fault reported but proven to be mistaken37
M8Technical failures above the Solebar34
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)31
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties4,979
TGDriver2,105
MDTechnical failures below the solebar2,054
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,992
IBPoints failure (including no fault found)1,592
IASignal failure (including no fault found)1,382
IGBlock failure1,169
XRCable vandalism or theft1,165
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,066
M8Technical failures above the Solebar1,053