Barrhead
846 delay minutes
The biggest share (36%) of the delay picked up at Barrhead in the four weeks to 9 December 2023 came from how the network was run.
70% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 44 | 5% | 16% | 2 a day, the least in 5 years | - |
| Weather and structures | 136 | 16% | 7% | 5 a day, the most in 5 years | 2 |
| Autumn | 19 | 2% | 7% | 1 a day, the least in 5 years | - |
| External | 41 | 5% | 4% | 1 a day, more than 3 of the other 4 years | 3 |
| Network management | 304 | 36% | 17% | 11 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 119 | 14% | 16% | 4 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 60 | 7% | 11% | 2 a day, more than 2 of the other 4 years | 1 |
| Stations | 49 | 6% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 35 | 4% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 41 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 178 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 68 |
| MD | Technical failures below the solebar | 54 |
| JK | Flooding not due to exceptional weather | 47 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 45 |
| XP | BRIDGE HIT | 41 |
| TG | Driver | 40 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 37 |
| M8 | Technical failures above the Solebar | 34 |
| JF | Off track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure) | 31 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 4,979 |
| TG | Driver | 2,105 |
| MD | Technical failures below the solebar | 2,054 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,992 |
| IB | Points failure (including no fault found) | 1,592 |
| IA | Signal failure (including no fault found) | 1,382 |
| IG | Block failure | 1,169 |
| XR | Cable vandalism or theft | 1,165 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,066 |
| M8 | Technical failures above the Solebar | 1,053 |