Barry
671 delay minutes
The biggest share (44%) of the delay picked up at Barry in the four weeks to 9 December 2023 came from signal, points and power faults.
52% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 18 | 3% | 8% | 1 a day, the most in 5 years | 3 |
| Signals, points and power | 294 | 44% | 16% | 11 a day, the most in 5 years | 4 |
| Weather and structures | 20 | 3% | 7% | 1 a day, more than 1 of the other 4 years | 1 |
| Autumn | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | 1 |
| Network management | 66 | 10% | 17% | 2 a day, more than 1 of the other 4 years | 27 |
| The operators' causes | |||||
| Train faults | 105 | 16% | 16% | 4 a day, more than 2 of the other 4 years | 15 |
| Traincrew | 83 | 12% | 11% | 3 a day, more than 3 of the other 4 years | 7 |
| Stations | 42 | 6% | 3% | 2 a day, more than 2 of the other 4 years | 6 |
| Operations | 39 | 6% | 5% | 1 a day, more than 3 of the other 4 years | 13 |
| Operator, other | 3 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 214 |
| IC | Track circuit failure (including no fault found) | 66 |
| TG | Driver | 57 |
| T2 | Delay at unstaffed station to non-DOO train | 39 |
| MD | Technical failures below the solebar | 35 |
| TZ | Other Passenger Train Operating Company causes | 33 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 32 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 25 |
| TW | Driver adhering to company professional driving standards or policy | 17 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,475 |
| T2 | Delay at unstaffed station to non-DOO train | 1,304 |
| J3 | Axle Counter Failure | 1,280 |
| MD | Technical failures below the solebar | 1,196 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 884 |
| M8 | Technical failures above the Solebar | 869 |
| TH | (Senior) Conductor/Train Manager | 826 |
| M7 | Door and Door system faults | 782 |
| TG | Driver | 750 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 711 |