Brighton
3,802 delay minutes
The biggest share (27%) of the delay picked up at Brighton in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 215 | 6% | 8% | 8 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 709 | 19% | 16% | 25 a day, more than 1 of the other 4 years | 11 |
| Weather and structures | 254 | 7% | 7% | 9 a day, more than 3 of the other 4 years | 8 |
| Autumn | 16 | <1% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 312 | 8% | 4% | 11 a day, the most in 5 years | 2 |
| Network management | 1,020 | 27% | 17% | 36 a day, more than 1 of the other 4 years | 33 |
| The operators' causes | |||||
| Train faults | 343 | 9% | 16% | 12 a day, more than 1 of the other 4 years | 8 |
| Traincrew | 625 | 16% | 11% | 22 a day, more than 1 of the other 4 years | 19 |
| Stations | 141 | 4% | 3% | 5 a day, the most in 5 years | - |
| Operations | 128 | 3% | 5% | 5 a day, more than 2 of the other 4 years | 6 |
| Operator, other | 40 | 1% | 7% | 1 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 397 |
| IB | Points failure (including no fault found) | 318 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 277 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 182 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 173 |
| XB | Vandalism or theft (including the placing of objects on the line) | 172 |
| M8 | Technical failures above the Solebar | 145 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 145 |
| II | Signalling lineside cable fault | 144 |
| TI | Traincrew rostering problem | 140 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 28,962 |
| IC | Track circuit failure (including no fault found) | 13,187 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 12,971 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12,066 |
| M8 | Technical failures above the Solebar | 11,232 |
| TI | Traincrew rostering problem | 10,742 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 9,414 |
| IB | Points failure (including no fault found) | 7,924 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 7,831 |
| OB | Delayed by signaller not applying applicable regulating policy | 6,831 |