3,802 delay minutes

The biggest share (27%) of the delay picked up at Brighton in the four weeks to 9 December 2023 came from how the network was run.

79% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2156%8% 8 a day, more than 2 of the other 4 years1
Signals, points and power70919%16% 25 a day, more than 1 of the other 4 years11
Weather and structures2547%7% 9 a day, more than 3 of the other 4 years8
Autumn16<1%7% 1 a day, more than 1 of the other 4 years-
External3128%4% 11 a day, the most in 5 years2
Network management1,02027%17% 36 a day, more than 1 of the other 4 years33
The operators' causes
Train faults3439%16% 12 a day, more than 1 of the other 4 years8
Traincrew62516%11% 22 a day, more than 1 of the other 4 years19
Stations1414%3% 5 a day, the most in 5 years-
Operations1283%5% 5 a day, more than 2 of the other 4 years6
Operator, other401%7% 1 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver397
IBPoints failure (including no fault found)318
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)277
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)182
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.173
XBVandalism or theft (including the placing of objects on the line)172
M8Technical failures above the Solebar145
OCSignaller including mis-routing (not ERTM /ETCS related)145
IISignalling lineside cable fault144
TITraincrew rostering problem140
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver28,962
ICTrack circuit failure (including no fault found)13,187
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)12,971
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12,066
M8Technical failures above the Solebar11,232
TITraincrew rostering problem10,742
OCSignaller including mis-routing (not ERTM /ETCS related)9,414
IBPoints failure (including no fault found)7,924
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure7,831
OBDelayed by signaller not applying applicable regulating policy6,831