Leaves on the Line

Berwick-upon-Tweed

BWK East Coast route
CSV JSON

328 delay minutes

The biggest share (28%) of the delay picked up at Berwick-upon-Tweed in the four weeks to 9 December 2023 came from weather and structures.

34% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track134%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power7723%16% 3 a day, more than 3 of the other 4 years-
Weather and structures9228%7% 3 a day, more than 2 of the other 4 years-
Autumn3<1%7% 0 a day, more than 2 of the other 4 years-
External93%4% 0 a day, the most in 5 years-
Network management5918%17% 2 a day, the most in 5 years-
The operators' causes
Train faults3611%16% 1 a day, more than 2 of the other 4 years-
Traincrew144%11% 1 a day, more than 1 of the other 4 years-
Stations41%3% 0 a day, more than 1 of the other 4 years-
Operations41%5% 0 a day, more than 2 of the other 4 years-
Operator, other185%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles57
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)47
JKFlooding not due to exceptional weather39
MWWeather - effect on T&RS equipment32
I1Overhead line/third rail defect20
OUDelays not Investigated by Network Rail17
OCSignaller including mis-routing (not ERTM /ETCS related)16
Q1Takeback Pumps14
FWLate start/yard overtime not explained by Operator12
IRBroken/cracked/twisted/buckled/flawed rail11
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,981
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,433
I1Overhead line/third rail defect1,152
IRBroken/cracked/twisted/buckled/flawed rail1,070
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.783
I8Animal Strike or Incursion within the control of Network Rail704
TGDriver598
X8Animal Strike or incursion not within the control of Network Rail583
IASignal failure (including no fault found)578
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles513