Leaves on the Line

Barry Island

BYI Wales route
CSV JSON

753 delay minutes

The biggest share (23%) of the delay picked up at Barry Island in the four weeks to 9 December 2023 came from the operators' own operations.

99% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track446%8% 2 a day, the most in 5 years-
Signals, points and power7610%16% 3 a day, more than 2 of the other 4 years-
Weather and structures3<1%7% 0 a day, more than 2 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management628%17% 2 a day, the least in 5 years-
The operators' causes
Train faults10914%16% 4 a day, the least in 5 years15
Traincrew13418%11% 5 a day, more than 2 of the other 4 years-
Stations13718%3% 5 a day, more than 2 of the other 4 years-
Operations17423%5% 6 a day, the most in 5 years-
Operator, other142%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes171
T2Delay at unstaffed station to non-DOO train114
TGDriver50
J3Axle Counter Failure45
IRBroken/cracked/twisted/buckled/flawed rail44
TH(Senior) Conductor/Train Manager44
M7Door and Door system faults24
MUDepot operating problem24
T3Waiting connections from other transport modes22
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)21
Since 2018
CodeWhat Network Rail loggedMinutes
T2Delay at unstaffed station to non-DOO train5,311
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps3,591
TGDriver3,243
TH(Senior) Conductor/Train Manager3,171
OUDelays not Investigated by Network Rail2,676
MDTechnical failures below the solebar2,016
TZOther Passenger Train Operating Company causes1,987
M8Technical failures above the Solebar1,774
J3Axle Counter Failure1,295
M7Door and Door system faults1,188