Carnoustie
1,095 delay minutes
The biggest share (25%) of the delay picked up at Carnoustie in the four weeks to 9 December 2023 came from signal, points and power faults.
31% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 21 | 2% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 278 | 25% | 16% | 10 a day, the most in 5 years | - |
| Weather and structures | 157 | 14% | 7% | 6 a day, more than 2 of the other 4 years | - |
| Autumn | 101 | 9% | 7% | 4 a day, more than 3 of the other 4 years | - |
| External | 89 | 8% | 4% | 3 a day, the most in 5 years | - |
| Network management | 216 | 20% | 17% | 8 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 88 | 8% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Traincrew | 45 | 4% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 7 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 33 | 3% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 62 | 6% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 174 |
| ZU | No Cause Identified After investigation by both Parties | 140 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 87 |
| IC | Track circuit failure (including no fault found) | 80 |
| XP | BRIDGE HIT | 77 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 55 |
| Q3 | NZ Pumps T | 55 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 46 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 43 |
| TG | Driver | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 7,485 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 2,078 |
| TG | Driver | 1,906 |
| MD | Technical failures below the solebar | 1,721 |
| JK | Flooding not due to exceptional weather | 1,505 |
| M8 | Technical failures above the Solebar | 1,321 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,310 |
| Q3 | NZ Pumps T | 1,303 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,115 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,011 |