Leaves on the Line

Carnoustie

CAN Scotland route
CSV JSON

1,095 delay minutes

The biggest share (25%) of the delay picked up at Carnoustie in the four weeks to 9 December 2023 came from signal, points and power faults.

31% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track212%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power27825%16% 10 a day, the most in 5 years-
Weather and structures15714%7% 6 a day, more than 2 of the other 4 years-
Autumn1019%7% 4 a day, more than 3 of the other 4 years-
External898%4% 3 a day, the most in 5 years-
Network management21620%17% 8 a day, more than 2 of the other 4 years-
The operators' causes
Train faults888%16% 3 a day, more than 2 of the other 4 years-
Traincrew454%11% 2 a day, more than 2 of the other 4 years-
Stations7<1%3% 0 a day, the least in 5 years-
Operations333%5% 1 a day, the most in 5 years-
Operator, other626%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure174
ZUNo Cause Identified After investigation by both Parties140
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure87
ICTrack circuit failure (including no fault found)80
XPBRIDGE HIT77
MPRail / wheel interface, adhesion problems (including ice on the running rail)55
Q3NZ Pumps T55
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed46
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions43
TGDriver39
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties7,485
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,078
TGDriver1,906
MDTechnical failures below the solebar1,721
JKFlooding not due to exceptional weather1,505
M8Technical failures above the Solebar1,321
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,310
Q3NZ Pumps T1,303
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,115
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,011