Leaves on the Line

Caterham

CAT Sussex route
CSV JSON

172 delay minutes

The biggest share (48%) of the delay picked up at Caterham in the four weeks to 9 December 2023 came from how the network was run.

56% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track32%8% 0 a day, the least in 5 years-
Signals, points and power95%16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years1
Network management8248%17% 3 a day, the least in 5 years2
The operators' causes
Train faults2112%16% 1 a day, more than 1 of the other 4 years-
Traincrew3621%11% 1 a day, more than 1 of the other 4 years3
Stations74%3% 0 a day, more than 1 of the other 4 years-
Operations42%5% 0 a day, more than 2 of the other 4 years-
Operator, other106%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)33
OCSignaller including mis-routing (not ERTM /ETCS related)30
TGDriver18
TITraincrew rostering problem18
OBDelayed by signaller not applying applicable regulating policy14
MTConfirmed train borne safety system faults (not cab based)10
IISignalling lineside cable fault6
MDTechnical failures below the solebar6
VHPassenger Communication cord, door egress or emergency train alarm operated6
M8Technical failures above the Solebar5
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,960
OCSignaller including mis-routing (not ERTM /ETCS related)4,347
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,112
ICTrack circuit failure (including no fault found)1,586
OBDelayed by signaller not applying applicable regulating policy1,071
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,016
M8Technical failures above the Solebar955
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure841
IESignalling Functional Power Supply Failure832
TITraincrew rostering problem804