Coatbridge Central
159 delay minutes
The biggest share (29%) of the delay picked up at Coatbridge Central in the four weeks to 9 December 2023 came from how the network was run.
91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2 | 1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 4 | 3% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 11 | 7% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 21 | 13% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 10 | 6% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 46 | 29% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 20 | 13% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Traincrew | 7 | 4% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 3 | 2% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 35 | 22% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 21 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 16 |
| J8 | OTM DAMAGE | 14 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 14 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 13 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 10 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 9 |
| TG | Driver | 7 |
| XM | External utility incident including gas, water mains, overhead power lines | 7 |
| M8 | Technical failures above the Solebar | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,986 |
| TG | Driver | 693 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 444 |
| Q3 | NZ Pumps T | 357 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 338 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 314 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 291 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 244 |
| M8 | Technical failures above the Solebar | 189 |
| OU | Delays not Investigated by Network Rail | 175 |