Leaves on the Line

Coatbridge Central

CBC Scotland route
CSV JSON

159 delay minutes

The biggest share (29%) of the delay picked up at Coatbridge Central in the four weeks to 9 December 2023 came from how the network was run.

91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track21%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power43%16% 0 a day, the least in 5 years-
Weather and structures117%7% 0 a day, more than 2 of the other 4 years-
Autumn2113%7% 1 a day, more than 2 of the other 4 years-
External106%4% 0 a day, more than 1 of the other 4 years-
Network management4629%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults2013%16% 1 a day, more than 3 of the other 4 years-
Traincrew74%11% 0 a day, more than 2 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations32%5% 0 a day, the least in 5 years-
Operator, other3522%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T21
MPRail / wheel interface, adhesion problems (including ice on the running rail)16
J8OTM DAMAGE14
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions14
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)13
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)10
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions9
TGDriver7
XMExternal utility incident including gas, water mains, overhead power lines7
M8Technical failures above the Solebar6
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,986
TGDriver693
IRBroken/cracked/twisted/buckled/flawed rail444
Q3NZ Pumps T357
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)338
MPRail / wheel interface, adhesion problems (including ice on the running rail)314
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions291
OCSignaller including mis-routing (not ERTM /ETCS related)244
M8Technical failures above the Solebar189
OUDelays not Investigated by Network Rail175