135 delay minutes

The biggest share (46%) of the delay picked up at Coatbridge Sunnyside in the four weeks to 9 December 2023 came from other operator causes.

40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track43%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power75%16% 0 a day, more than 2 of the other 4 years1
Weather and structures21%7% 0 a day, more than 1 of the other 4 years-
Autumn1410%7% 1 a day, more than 1 of the other 4 years-
External43%4% 0 a day, the most in 5 years-
Network management118%17% 0 a day, more than 1 of the other 4 years-
The operators' causes
Train faults2116%16% 1 a day, more than 1 of the other 4 years-
Traincrew75%11% 0 a day, the least in 5 years-
Stations32%3% 0 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other6246%7% 2 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VBVandalism or theft42
MPRail / wheel interface, adhesion problems (including ice on the running rail)13
Q3NZ Pumps T13
M7Door and Door system faults12
OMTechnical failure associated with a Railhead conditioning train11
I2AC/DC trip (including no fault or cause found)7
TGDriver7
VHPassenger Communication cord, door egress or emergency train alarm operated7
M8Technical failures above the Solebar6
ITRough ride or bumps reported - cause not known or no fault found4
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,275
M8Technical failures above the Solebar849
VHPassenger Communication cord, door egress or emergency train alarm operated793
TGDriver660
QICautioning due to railhead leaf contamination420
MNBrake and brake systems faults; including wheel flats where no other cause had been identified392
MDTechnical failures below the solebar362
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)342
MPRail / wheel interface, adhesion problems (including ice on the running rail)317
Q3NZ Pumps T298