Coatbridge Sunnyside
135 delay minutes
The biggest share (46%) of the delay picked up at Coatbridge Sunnyside in the four weeks to 9 December 2023 came from other operator causes.
40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 3% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 7 | 5% | 16% | 0 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 2 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 14 | 10% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 4 | 3% | 4% | 0 a day, the most in 5 years | - |
| Network management | 11 | 8% | 17% | 0 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 21 | 16% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 7 | 5% | 11% | 0 a day, the least in 5 years | - |
| Stations | 3 | 2% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 62 | 46% | 7% | 2 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VB | Vandalism or theft | 42 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 13 |
| Q3 | NZ Pumps T | 13 |
| M7 | Door and Door system faults | 12 |
| OM | Technical failure associated with a Railhead conditioning train | 11 |
| I2 | AC/DC trip (including no fault or cause found) | 7 |
| TG | Driver | 7 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 7 |
| M8 | Technical failures above the Solebar | 6 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,275 |
| M8 | Technical failures above the Solebar | 849 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 793 |
| TG | Driver | 660 |
| QI | Cautioning due to railhead leaf contamination | 420 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 392 |
| MD | Technical failures below the solebar | 362 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 342 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 317 |
| Q3 | NZ Pumps T | 298 |