Leaves on the Line

Chichester

CCH Sussex route
CSV JSON

1,052 delay minutes

The biggest share (30%) of the delay picked up at Chichester in the four weeks to 9 December 2023 came from signal, points and power faults.

83% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track12912%8% 5 a day, the most in 5 years-
Signals, points and power31230%16% 11 a day, more than 3 of the other 4 years9
Weather and structures222%7% 1 a day, more than 2 of the other 4 years-
Autumn666%7% 2 a day, more than 2 of the other 4 years5
External666%4% 2 a day, more than 3 of the other 4 years-
Network management19318%17% 7 a day, the least in 5 years-
The operators' causes
Train faults848%16% 3 a day, more than 1 of the other 4 years2
Traincrew666%11% 2 a day, the least in 5 years1
Stations192%3% 1 a day, more than 1 of the other 4 years-
Operations293%5% 1 a day, more than 2 of the other 4 years-
Operator, other666%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IISignalling lineside cable fault113
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.89
IBPoints failure (including no fault found)86
OCSignaller including mis-routing (not ERTM /ETCS related)64
Q3NZ Pumps T63
TTLeaf fall Neutral63
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)45
TGDriver44
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)35
ITRough ride or bumps reported - cause not known or no fault found28
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,630
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,268
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles3,308
OCSignaller including mis-routing (not ERTM /ETCS related)3,045
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,809
ICTrack circuit failure (including no fault found)2,762
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,519
IISignalling lineside cable fault2,495
TITraincrew rostering problem2,248
MDTechnical failures below the solebar1,744