Chichester
1,052 delay minutes
The biggest share (30%) of the delay picked up at Chichester in the four weeks to 9 December 2023 came from signal, points and power faults.
83% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 129 | 12% | 8% | 5 a day, the most in 5 years | - |
| Signals, points and power | 312 | 30% | 16% | 11 a day, more than 3 of the other 4 years | 9 |
| Weather and structures | 22 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 66 | 6% | 7% | 2 a day, more than 2 of the other 4 years | 5 |
| External | 66 | 6% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 193 | 18% | 17% | 7 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 84 | 8% | 16% | 3 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 66 | 6% | 11% | 2 a day, the least in 5 years | 1 |
| Stations | 19 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 29 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 66 | 6% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 113 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 89 |
| IB | Points failure (including no fault found) | 86 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 64 |
| Q3 | NZ Pumps T | 63 |
| TT | Leaf fall Neutral | 63 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 45 |
| TG | Driver | 44 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 35 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,630 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,268 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 3,308 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,045 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,809 |
| IC | Track circuit failure (including no fault found) | 2,762 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,519 |
| II | Signalling lineside cable fault | 2,495 |
| TI | Traincrew rostering problem | 2,248 |
| MD | Technical failures below the solebar | 1,744 |