Cardiff Central
12,548 delay minutes
The biggest share (44%) of the delay picked up at Cardiff Central in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 342 | 3% | 8% | 12 a day, the most in 5 years | 21 |
| Signals, points and power | 1,053 | 8% | 16% | 38 a day, more than 3 of the other 4 years | 42 |
| Weather and structures | 123 | <1% | 7% | 4 a day, more than 3 of the other 4 years | 18 |
| Autumn | 120 | <1% | 7% | 4 a day, more than 1 of the other 4 years | 2 |
| External | 86 | <1% | 4% | 3 a day, the least in 5 years | 1 |
| Network management | 1,035 | 8% | 17% | 37 a day, more than 2 of the other 4 years | 984 |
| The operators' causes | |||||
| Train faults | 5,567 | 44% | 16% | 199 a day, the most in 5 years | 162 |
| Traincrew | 2,472 | 20% | 11% | 88 a day, the most in 5 years | 60 |
| Stations | 656 | 5% | 3% | 23 a day, more than 3 of the other 4 years | 1 |
| Operations | 944 | 8% | 5% | 34 a day, more than 3 of the other 4 years | 21 |
| Operator, other | 152 | 1% | 7% | 5 a day, the least in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,461 |
| TG | Driver | 1,722 |
| M8 | Technical failures above the Solebar | 880 |
| TZ | Other Passenger Train Operating Company causes | 550 |
| MU | Depot operating problem | 495 |
| M7 | Door and Door system faults | 403 |
| MD | Technical failures below the solebar | 387 |
| T2 | Delay at unstaffed station to non-DOO train | 355 |
| M9 | Reported fleet equipment defect - no fault found | 309 |
| TH | (Senior) Conductor/Train Manager | 297 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 59,516 |
| TG | Driver | 42,025 |
| M8 | Technical failures above the Solebar | 27,544 |
| MU | Depot operating problem | 26,025 |
| MD | Technical failures below the solebar | 24,982 |
| TZ | Other Passenger Train Operating Company causes | 18,763 |
| TH | (Senior) Conductor/Train Manager | 17,126 |
| OU | Delays not Investigated by Network Rail | 13,770 |
| M7 | Door and Door system faults | 13,348 |
| J3 | Axle Counter Failure | 12,990 |