Coulsdon Town
81 delay minutes
Most of the delay picked up at Coulsdon Town in the four weeks to 9 December 2023 came from how the network was run.
40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | 3 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 72 | 89% | 17% | 3 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | 1 |
| Traincrew | 6 | 7% | 11% | 0 a day, the least in 5 years | 1 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 3 | 4% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 29 |
| OQ | Incorrect simplifier | 20 |
| OB | Delayed by signaller not applying applicable regulating policy | 10 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 5 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 4 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 4 |
| TG | Driver | 3 |
| TW | Driver adhering to company professional driving standards or policy | 3 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,728 |
| TG | Driver | 2,691 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,865 |
| IC | Track circuit failure (including no fault found) | 983 |
| OB | Delayed by signaller not applying applicable regulating policy | 690 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 578 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 524 |
| IB | Points failure (including no fault found) | 384 |
| M8 | Technical failures above the Solebar | 382 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 377 |