CSV JSON

81 delay minutes

Most of the delay picked up at Coulsdon Town in the four weeks to 9 December 2023 came from how the network was run.

40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years3
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management7289%17% 3 a day, more than 2 of the other 4 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years1
Traincrew67%11% 0 a day, the least in 5 years1
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other34%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OCSignaller including mis-routing (not ERTM /ETCS related)29
OQIncorrect simplifier20
OBDelayed by signaller not applying applicable regulating policy10
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)5
I6Delays as a result of line blocks / track patrols (including late handback)4
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive4
TGDriver3
TWDriver adhering to company professional driving standards or policy3
VHPassenger Communication cord, door egress or emergency train alarm operated3
Since 2018
CodeWhat Network Rail loggedMinutes
OCSignaller including mis-routing (not ERTM /ETCS related)2,728
TGDriver2,691
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,865
ICTrack circuit failure (including no fault found)983
OBDelayed by signaller not applying applicable regulating policy690
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure578
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)524
IBPoints failure (including no fault found)384
M8Technical failures above the Solebar382
VHPassenger Communication cord, door egress or emergency train alarm operated377