0 delay minutes

No delay was picked up at Charing Cross (Glasgow) in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure43
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)22
QICautioning due to railhead leaf contamination16
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11
I1Overhead line/third rail defect11
ONDelays not properly investigated by Network Rail10
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)10
M8Technical failures above the Solebar9
OARegulation Decision Made With Best Endeavours7
IASignal failure (including no fault found)7