Chathill
114 delay minutes
Most of the delay picked up at Chathill in the four weeks to 9 December 2023 came from weather and structures.
90% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | 3% | 8% | - |
| Signals, points and power | 5 | 4% | 16% | - |
| Weather and structures | 59 | 52% | 7% | - |
| Autumn | 9 | 8% | 7% | - |
| External | - | - | 4% | - |
| Network management | 7 | 6% | 17% | 10 |
| The operators' causes | ||||
| Train faults | 15 | 13% | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 12 | 11% | 5% | - |
| Operator, other | 4 | 4% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 26 |
| JK | Flooding not due to exceptional weather | 20 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 13 |
| MD | Technical failures below the solebar | 8 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 7 |
| OU | Delays not Investigated by Network Rail | 7 |
| TZ | Other Passenger Train Operating Company causes | 7 |
| J0 | Telecom equipment radio failure (GSM-R) | 5 |
| QI | Cautioning due to railhead leaf contamination | 5 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 329 |
| MD | Technical failures below the solebar | 300 |
| TG | Driver | 256 |
| I1 | Overhead line/third rail defect | 188 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 167 |
| IB | Points failure (including no fault found) | 159 |
| M8 | Technical failures above the Solebar | 150 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 133 |
| JB | Reactionary Delay to 'P' coded TSRs | 133 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 122 |