Leaves on the Line

Chathill

CHT East Coast route
CSV JSON

114 delay minutes

Most of the delay picked up at Chathill in the four weeks to 9 December 2023 came from weather and structures.

90% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track33%8%-
Signals, points and power54%16%-
Weather and structures5952%7%-
Autumn98%7%-
External--4%-
Network management76%17%10
The operators' causes
Train faults1513%16%-
Traincrew--11%-
Stations--3%-
Operations1211%5%-
Operator, other44%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)26
JKFlooding not due to exceptional weather20
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail13
MDTechnical failures below the solebar8
MNBrake and brake systems faults; including wheel flats where no other cause had been identified7
OUDelays not Investigated by Network Rail7
TZOther Passenger Train Operating Company causes7
J0Telecom equipment radio failure (GSM-R)5
QICautioning due to railhead leaf contamination5
T8Delays at Station believed to be operator cause and Information required from operator (Ops responsibility)5
Since 2018
CodeWhat Network Rail loggedMinutes
MUDepot operating problem329
MDTechnical failures below the solebar300
TGDriver256
I1Overhead line/third rail defect188
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)167
IBPoints failure (including no fault found)159
M8Technical failures above the Solebar150
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.133
JBReactionary Delay to 'P' coded TSRs133
MNBrake and brake systems faults; including wheel flats where no other cause had been identified122