0 delay minutes
No delay was picked up at Crosskeys in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 244 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 231 |
| TG | Driver | 195 |
| TH | (Senior) Conductor/Train Manager | 151 |
| IB | Points failure (including no fault found) | 150 |
| ZY | Univestigated station overtime System Roll-up Only | 119 |
| M9 | Reported fleet equipment defect - no fault found | 118 |
| MD | Technical failures below the solebar | 106 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 101 |
| TZ | Other Passenger Train Operating Company causes | 98 |