0 delay minutes

No delay was picked up at Crosskeys in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail244
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps231
TGDriver195
TH(Senior) Conductor/Train Manager151
IBPoints failure (including no fault found)150
ZYUnivestigated station overtime System Roll-up Only119
M9Reported fleet equipment defect - no fault found118
MDTechnical failures below the solebar106
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail101
TZOther Passenger Train Operating Company causes98