Clarbeston Road
377 delay minutes
Most of the delay picked up at Clarbeston Road in the four weeks to 9 December 2023 came from signal, points and power faults.
26% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 210 | 56% | 16% | 8 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 6 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 47 | 12% | 17% | 2 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 19 | 5% | 16% | 1 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 32 | 8% | 11% | 1 a day, the most in 5 years | 1 |
| Stations | 48 | 13% | 3% | 2 a day, the most in 5 years | - |
| Operations | 16 | 4% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 63 |
| T2 | Delay at unstaffed station to non-DOO train | 48 |
| IC | Track circuit failure (including no fault found) | 42 |
| IL | Token equipment failure (including no fault found) | 34 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 32 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 25 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 17 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 15 |
| II | Signalling lineside cable fault | 15 |
| RD | Attaching/detaching/shunter/watering | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 1,449 |
| IC | Track circuit failure (including no fault found) | 1,183 |
| IA | Signal failure (including no fault found) | 1,023 |
| II | Signalling lineside cable fault | 959 |
| ZY | Univestigated station overtime System Roll-up Only | 956 |
| MC | Diesel Loco failure, defect, attention | 739 |
| MD | Technical failures below the solebar | 687 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 602 |
| TG | Driver | 461 |
| OU | Delays not Investigated by Network Rail | 459 |