Leaves on the Line

Crowborough

COH Sussex route
CSV JSON

561 delay minutes

The biggest share (32%) of the delay picked up at Crowborough in the four weeks to 9 December 2023 came from signal, points and power faults.

83% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3<1%8% 0 a day, the least in 5 years-
Signals, points and power17832%16% 6 a day, the most in 5 years5
Weather and structures163%7% 1 a day, more than 1 of the other 4 years-
Autumn397%7% 1 a day, more than 3 of the other 4 years1
External3<1%4% 0 a day, more than 1 of the other 4 years-
Network management17431%17% 6 a day, more than 3 of the other 4 years3
The operators' causes
Train faults193%16% 1 a day, the least in 5 years-
Traincrew7313%11% 3 a day, more than 1 of the other 4 years-
Stations163%3% 1 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other407%7% 1 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)97
IBPoints failure (including no fault found)74
TGDriver49
IISignalling lineside cable fault42
J0Telecom equipment radio failure (GSM-R)20
Q3NZ Pumps T20
TTLeaf fall Neutral20
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive17
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident17
JKFlooding not due to exceptional weather16
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,754
TGDriver2,329
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,758
IBPoints failure (including no fault found)1,457
ICTrack circuit failure (including no fault found)1,261
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,216
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,150
MDTechnical failures below the solebar964
IRBroken/cracked/twisted/buckled/flawed rail932
OCSignaller including mis-routing (not ERTM /ETCS related)912