Crowborough
561 delay minutes
The biggest share (32%) of the delay picked up at Crowborough in the four weeks to 9 December 2023 came from signal, points and power faults.
83% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 178 | 32% | 16% | 6 a day, the most in 5 years | 5 |
| Weather and structures | 16 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 39 | 7% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 174 | 31% | 17% | 6 a day, more than 3 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 19 | 3% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 73 | 13% | 11% | 3 a day, more than 1 of the other 4 years | - |
| Stations | 16 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 40 | 7% | 7% | 1 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 97 |
| IB | Points failure (including no fault found) | 74 |
| TG | Driver | 49 |
| II | Signalling lineside cable fault | 42 |
| J0 | Telecom equipment radio failure (GSM-R) | 20 |
| Q3 | NZ Pumps T | 20 |
| TT | Leaf fall Neutral | 20 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 17 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 17 |
| JK | Flooding not due to exceptional weather | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,754 |
| TG | Driver | 2,329 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,758 |
| IB | Points failure (including no fault found) | 1,457 |
| IC | Track circuit failure (including no fault found) | 1,261 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,216 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,150 |
| MD | Technical failures below the solebar | 964 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 932 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 912 |