Crosshill
0 delay minutes
No delay was picked up at Crosshill in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 16 |
| TG | Driver | 16 |
| M8 | Technical failures above the Solebar | 10 |
| R2 | Late TRTS given by station staff | 6 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 5 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4 |
| QM | Train schedule/STP Process including erroneous simplifiers | 3 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 3 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 3 |
| RB | Passengers joining/alighting | 2 |