Cowdenbeath
91 delay minutes
The biggest share (21%) of the delay picked up at Cowdenbeath in the four weeks to 9 December 2023 came from autumn leaves.
10% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 4 | 4% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 20 | 21% | 7% | - |
| External | 14 | 15% | 4% | 4 |
| Network management | 13 | 14% | 17% | 5 |
| The operators' causes | ||||
| Train faults | 16 | 18% | 16% | 10 |
| Traincrew | 4 | 4% | 11% | - |
| Stations | 8 | 9% | 3% | - |
| Operations | 3 | 3% | 5% | - |
| Operator, other | 10 | 10% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 10 |
| Q3 | NZ Pumps T | 10 |
| XP | BRIDGE HIT | 9 |
| MD | Technical failures below the solebar | 8 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 8 |
| QI | Cautioning due to railhead leaf contamination | 7 |
| OA | Regulation Decision Made With Best Endeavours | 6 |
| XB | Vandalism or theft (including the placing of objects on the line) | 5 |
| J0 | Telecom equipment radio failure (GSM-R) | 4 |
| J8 | OTM DAMAGE | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 295 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 226 |
| IC | Track circuit failure (including no fault found) | 215 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 206 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 187 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 159 |
| Q3 | NZ Pumps T | 149 |
| MD | Technical failures below the solebar | 146 |
| TG | Driver | 133 |
| II | Signalling lineside cable fault | 123 |