91 delay minutes

The biggest share (21%) of the delay picked up at Cowdenbeath in the four weeks to 9 December 2023 came from autumn leaves.

10% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power44%16%-
Weather and structures--7%-
Autumn2021%7%-
External1415%4%4
Network management1314%17%5
The operators' causes
Train faults1618%16%10
Traincrew44%11%-
Stations89%3%-
Operations33%5%-
Operator, other1010%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MPRail / wheel interface, adhesion problems (including ice on the running rail)10
Q3NZ Pumps T10
XPBRIDGE HIT9
MDTechnical failures below the solebar8
MNBrake and brake systems faults; including wheel flats where no other cause had been identified8
QICautioning due to railhead leaf contamination7
OARegulation Decision Made With Best Endeavours6
XBVandalism or theft (including the placing of objects on the line)5
J0Telecom equipment radio failure (GSM-R)4
J8OTM DAMAGE4
Since 2018
CodeWhat Network Rail loggedMinutes
IASignal failure (including no fault found)295
OCSignaller including mis-routing (not ERTM /ETCS related)226
ICTrack circuit failure (including no fault found)215
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)206
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)187
MPRail / wheel interface, adhesion problems (including ice on the running rail)159
Q3NZ Pumps T149
MDTechnical failures below the solebar146
TGDriver133
IISignalling lineside cable fault123