Crawley
393 delay minutes
The biggest share (32%) of the delay picked up at Crawley in the four weeks to 9 December 2023 came from signal, points and power faults.
58% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 127 | 32% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Weather and structures | 4 | 1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 9 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 14 | 4% | 4% | 1 a day, the least in 5 years | - |
| Network management | 92 | 23% | 17% | 3 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 9 | 2% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 104 | 26% | 11% | 4 a day, more than 3 of the other 4 years | - |
| Stations | 11 | 3% | 3% | 0 a day, the most in 5 years | - |
| Operations | 11 | 3% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 7 | 2% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 61 |
| IB | Points failure (including no fault found) | 47 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 43 |
| TI | Traincrew rostering problem | 36 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 32 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 20 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 17 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 12 |
| XB | Vandalism or theft (including the placing of objects on the line) | 11 |
| M8 | Technical failures above the Solebar | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,228 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,269 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,950 |
| TI | Traincrew rostering problem | 1,861 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,363 |
| IC | Track circuit failure (including no fault found) | 1,317 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,105 |
| M8 | Technical failures above the Solebar | 1,028 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 994 |
| OB | Delayed by signaller not applying applicable regulating policy | 806 |