29 delay minutes

Most of the delay picked up at Chatelherault in the four weeks to 9 December 2023 came from other operator causes.

66% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%1
Weather and structures310%7%1
Autumn517%7%1
External--4%-
Network management517%17%2
The operators' causes
Train faults--16%2
Traincrew--11%1
Stations--3%-
Operations--5%-
Operator, other1655%7%6

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated16
OBDelayed by signaller not applying applicable regulating policy5
QICautioning due to railhead leaf contamination5
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed3
Since 2018
CodeWhat Network Rail loggedMinutes
QICautioning due to railhead leaf contamination19
VHPassenger Communication cord, door egress or emergency train alarm operated16
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)11
ICTrack circuit failure (including no fault found)7
MNBrake and brake systems faults; including wheel flats where no other cause had been identified6
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions5
OBDelayed by signaller not applying applicable regulating policy5
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail4
TGDriver4