Cumbernauld
417 delay minutes
The biggest share (24%) of the delay picked up at Cumbernauld in the four weeks to 9 December 2023 came from other operator causes.
92% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 13 | 3% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 28 | 7% | 16% | 1 a day, more than 2 of the other 4 years | 13 |
| Weather and structures | 10 | 2% | 7% | 0 a day, more than 1 of the other 4 years | 5 |
| Autumn | 86 | 21% | 7% | 3 a day, the most in 5 years | - |
| External | 41 | 10% | 4% | 1 a day, the most in 5 years | 2 |
| Network management | 34 | 8% | 17% | 1 a day, more than 1 of the other 4 years | 9 |
| The operators' causes | |||||
| Train faults | 32 | 8% | 16% | 1 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 43 | 10% | 11% | 2 a day, more than 3 of the other 4 years | 2 |
| Stations | 12 | 3% | 3% | 0 a day, the most in 5 years | - |
| Operations | 17 | 4% | 5% | 1 a day, more than 1 of the other 4 years | 1 |
| Operator, other | 101 | 24% | 7% | 4 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 79 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 69 |
| TG | Driver | 43 |
| XM | External utility incident including gas, water mains, overhead power lines | 39 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 14 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 12 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 11 |
| TT | Leaf fall Neutral | 11 |
| IB | Points failure (including no fault found) | 10 |
| JB | Reactionary Delay to 'P' coded TSRs | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,317 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,916 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,231 |
| Q3 | NZ Pumps T | 643 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 568 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 517 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 509 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 470 |
| M8 | Technical failures above the Solebar | 438 |
| OU | Delays not Investigated by Network Rail | 376 |