Crowle
98 delay minutes
The biggest share (36%) of the delay picked up at Crowle in the four weeks to 9 December 2023 came from signal, points and power faults.
61% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 35 | 36% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 5 | 5% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 2 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 12 | 12% | 17% | 0 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 11 | 11% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Traincrew | 9 | 9% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 11 | 11% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 15 | 15% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 27 |
| M7 | Door and Door system faults | 8 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 6 |
| OU | Delays not Investigated by Network Rail | 6 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 6 |
| IW | Non severe weather - snow/ice/frost affecting infrastructure equipment excluding points | 5 |
| TG | Driver | 5 |
| AG | Wagon load incident including adjusting loads or open door | 4 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 4 |
| J0 | Telecom equipment radio failure (GSM-R) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,148 |
| IC | Track circuit failure (including no fault found) | 663 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 433 |
| IB | Points failure (including no fault found) | 426 |
| IA | Signal failure (including no fault found) | 374 |
| TG | Driver | 356 |
| II | Signalling lineside cable fault | 347 |
| MD | Technical failures below the solebar | 338 |
| FW | Late start/yard overtime not explained by Operator | 280 |
| XQ | Swing bridge open for river or canal traffic | 265 |