Leaves on the Line

Crowle

CWE East Coast route
CSV JSON

98 delay minutes

The biggest share (36%) of the delay picked up at Crowle in the four weeks to 9 December 2023 came from signal, points and power faults.

61% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power3536%16% 1 a day, more than 2 of the other 4 years-
Weather and structures55%7% 0 a day, more than 2 of the other 4 years-
Autumn22%7% 0 a day, more than 1 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management1212%17% 0 a day, more than 2 of the other 4 years-
The operators' causes
Train faults1111%16% 0 a day, more than 1 of the other 4 years-
Traincrew99%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations1111%5% 0 a day, more than 3 of the other 4 years-
Operator, other1515%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IESignalling Functional Power Supply Failure27
M7Door and Door system faults8
MPRail / wheel interface, adhesion problems (including ice on the running rail)6
OUDelays not Investigated by Network Rail6
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)6
IWNon severe weather - snow/ice/frost affecting infrastructure equipment excluding points5
TGDriver5
AGWagon load incident including adjusting loads or open door4
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles4
J0Telecom equipment radio failure (GSM-R)4
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,148
ICTrack circuit failure (including no fault found)663
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.433
IBPoints failure (including no fault found)426
IASignal failure (including no fault found)374
TGDriver356
IISignalling lineside cable fault347
MDTechnical failures below the solebar338
FWLate start/yard overtime not explained by Operator280
XQSwing bridge open for river or canal traffic265