Caersws
83 delay minutes
The biggest share (34%) of the delay picked up at Caersws in the four weeks to 9 December 2023 came from faulty trains.
10% of these minutes were knock-on from something that happened elsewhere first. 57% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 18 | 22% | 16% | - |
| Weather and structures | 11 | 13% | 7% | - |
| Autumn | 4 | 5% | 7% | - |
| External | - | - | 4% | - |
| Network management | 8 | 10% | 17% | - |
| The operators' causes | ||||
| Train faults | 28 | 34% | 16% | - |
| Traincrew | 6 | 7% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 8 | 10% | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M0 | Confirmed train cab based safety system fault (including GSMR) | 16 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 14 |
| M2 | Delay due to ATO / ETCS equipment | 12 |
| TZ | Other Passenger Train Operating Company causes | 8 |
| TG | Driver | 6 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 6 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 5 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 5 |
| IC | Track circuit failure (including no fault found) | 4 |
| QI | Cautioning due to railhead leaf contamination | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 622 |
| MD | Technical failures below the solebar | 255 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 239 |
| TG | Driver | 213 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 210 |
| OU | Delays not Investigated by Network Rail | 182 |
| TZ | Other Passenger Train Operating Company causes | 182 |
| M8 | Technical failures above the Solebar | 164 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 136 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 132 |