Leaves on the Line

Caersws

CWS Wales route
CSV JSON

83 delay minutes

The biggest share (34%) of the delay picked up at Caersws in the four weeks to 9 December 2023 came from faulty trains.

10% of these minutes were knock-on from something that happened elsewhere first. 57% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power1822%16%-
Weather and structures1113%7%-
Autumn45%7%-
External--4%-
Network management810%17%-
The operators' causes
Train faults2834%16%-
Traincrew67%11%-
Stations--3%-
Operations810%5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M0Confirmed train cab based safety system fault (including GSMR)16
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles14
M2Delay due to ATO / ETCS equipment12
TZOther Passenger Train Operating Company causes8
TGDriver6
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions6
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards5
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail5
ICTrack circuit failure (including no fault found)4
QICautioning due to railhead leaf contamination4
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)622
MDTechnical failures below the solebar255
M0Confirmed train cab based safety system fault (including GSMR)239
TGDriver213
OCSignaller including mis-routing (not ERTM /ETCS related)210
OUDelays not Investigated by Network Rail182
TZOther Passenger Train Operating Company causes182
M8Technical failures above the Solebar164
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure136
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail132