Leaves on the Line

Crystal Palace

CYP Sussex route
CSV JSON

2,022 delay minutes

The biggest share (34%) of the delay picked up at Crystal Palace in the four weeks to 9 December 2023 came from how the network was run.

55% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track43421%8% 16 a day, the most in 5 years-
Signals, points and power24812%16% 9 a day, the most in 5 years8
Weather and structures14<1%7% 1 a day, the most in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External261%4% 1 a day, more than 2 of the other 4 years1
Network management68234%17% 24 a day, more than 2 of the other 4 years22
The operators' causes
Train faults1146%16% 4 a day, more than 2 of the other 4 years2
Traincrew1327%11% 5 a day, the least in 5 years5
Stations25513%3% 9 a day, the most in 5 years5
Operations663%5% 2 a day, more than 3 of the other 4 years4
Operator, other513%7% 2 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.434
RBPassengers joining/alighting172
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)130
TGDriver122
OVFire or evacuation due to fire alarm of Network Rail buildings other than stations not due to vandalism102
J8OTM DAMAGE99
OCSignaller including mis-routing (not ERTM /ETCS related)80
QAWTT schedule and or LTP Process including erroneous simplifiers78
IISignalling lineside cable fault70
RAStation Buildings and Facilities (incl Platforms)61
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver9,550
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)9,139
OBDelayed by signaller not applying applicable regulating policy3,900
OCSignaller including mis-routing (not ERTM /ETCS related)3,759
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,374
RBPassengers joining/alighting3,348
VHPassenger Communication cord, door egress or emergency train alarm operated2,670
ICTrack circuit failure (including no fault found)2,363
M7Door and Door system faults2,239
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,899