50 delay minutes

Most of the delay picked up at Dalmally in the four weeks to 9 December 2023 came from how the network was run.

74% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power714%16%-
Weather and structures1326%7%-
Autumn--7%-
External--4%-
Network management3060%17%1
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards30
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions13
IASignal failure (including no fault found)7
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions701
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)71
MDTechnical failures below the solebar58
M8Technical failures above the Solebar42
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards39
TGDriver34
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.31
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure29
IHPower Supply And Distribution System Failure29
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)28