3,015 delay minutes

Most of the delay picked up at Darlington in the four weeks to 9 December 2023 came from weather and structures.

36% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track742%8% 3 a day, the least in 5 years-
Signals, points and power2247%16% 8 a day, more than 2 of the other 4 years3
Weather and structures1,59653%7% 57 a day, the most in 5 years1
Autumn25<1%7% 1 a day, the least in 5 years1
External311%4% 1 a day, more than 1 of the other 4 years-
Network management2247%17% 8 a day, more than 3 of the other 4 years10
The operators' causes
Train faults45015%16% 16 a day, more than 3 of the other 4 years4
Traincrew2187%11% 8 a day, more than 1 of the other 4 years30
Stations562%3% 2 a day, more than 1 of the other 4 years-
Operations813%5% 3 a day, more than 3 of the other 4 years-
Operator, other371%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,480
MWWeather - effect on T&RS equipment130
IBPoints failure (including no fault found)123
TGDriver122
OUDelays not Investigated by Network Rail98
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions94
MDTechnical failures below the solebar86
TH(Senior) Conductor/Train Manager85
MCDiesel Loco failure, defect, attention84
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.59
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,754
TGDriver5,411
IBPoints failure (including no fault found)4,237
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,137
MDTechnical failures below the solebar4,010
JSCondition of Track TSR outside the Timetable Planning Rules3,525
MNBrake and brake systems faults; including wheel flats where no other cause had been identified3,012
MUDepot operating problem2,533
M7Door and Door system faults2,175
M8Technical failures above the Solebar2,053