Darlington
3,015 delay minutes
Most of the delay picked up at Darlington in the four weeks to 9 December 2023 came from weather and structures.
36% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 74 | 2% | 8% | 3 a day, the least in 5 years | - |
| Signals, points and power | 224 | 7% | 16% | 8 a day, more than 2 of the other 4 years | 3 |
| Weather and structures | 1,596 | 53% | 7% | 57 a day, the most in 5 years | 1 |
| Autumn | 25 | <1% | 7% | 1 a day, the least in 5 years | 1 |
| External | 31 | 1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 224 | 7% | 17% | 8 a day, more than 3 of the other 4 years | 10 |
| The operators' causes | |||||
| Train faults | 450 | 15% | 16% | 16 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 218 | 7% | 11% | 8 a day, more than 1 of the other 4 years | 30 |
| Stations | 56 | 2% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 81 | 3% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 37 | 1% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,480 |
| MW | Weather - effect on T&RS equipment | 130 |
| IB | Points failure (including no fault found) | 123 |
| TG | Driver | 122 |
| OU | Delays not Investigated by Network Rail | 98 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 94 |
| MD | Technical failures below the solebar | 86 |
| TH | (Senior) Conductor/Train Manager | 85 |
| MC | Diesel Loco failure, defect, attention | 84 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 59 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,754 |
| TG | Driver | 5,411 |
| IB | Points failure (including no fault found) | 4,237 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,137 |
| MD | Technical failures below the solebar | 4,010 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,525 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,012 |
| MU | Depot operating problem | 2,533 |
| M7 | Door and Door system faults | 2,175 |
| M8 | Technical failures above the Solebar | 2,053 |