Leaves on the Line

Dumbarton Central

DBC Scotland route
CSV JSON

466 delay minutes

The biggest share (23%) of the delay picked up at Dumbarton Central in the four weeks to 9 December 2023 came from signal, points and power faults.

64% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track123%8% 0 a day, more than 1 of the other 4 years1
Signals, points and power10923%16% 4 a day, more than 3 of the other 4 years2
Weather and structures163%7% 1 a day, the least in 5 years1
Autumn4610%7% 2 a day, the least in 5 years2
External449%4% 2 a day, more than 3 of the other 4 years2
Network management9120%17% 3 a day, more than 2 of the other 4 years2
The operators' causes
Train faults429%16% 2 a day, more than 2 of the other 4 years10
Traincrew163%11% 1 a day, more than 1 of the other 4 years3
Stations82%3% 0 a day, the least in 5 years-
Operations82%5% 0 a day, more than 2 of the other 4 years2
Operator, other7516%7% 3 a day, more than 2 of the other 4 years7

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure97
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards48
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)40
Q3NZ Pumps T39
MPRail / wheel interface, adhesion problems (including ice on the running rail)33
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)22
TGDriver16
VHPassenger Communication cord, door egress or emergency train alarm operated16
M8Technical failures above the Solebar15
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions12
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,625
TGDriver2,213
M8Technical failures above the Solebar1,625
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)1,302
IBPoints failure (including no fault found)1,127
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,078
MDTechnical failures below the solebar973
Q3NZ Pumps T948
IRBroken/cracked/twisted/buckled/flawed rail930
MPRail / wheel interface, adhesion problems (including ice on the running rail)905