Dumbarton East

DBE Scotland route
CSV JSON

0 delay minutes

No delay was picked up at Dumbarton East in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%1
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure31
IBPoints failure (including no fault found)8
IHPower Supply And Distribution System Failure8
MNBrake and brake systems faults; including wheel flats where no other cause had been identified5
M7Door and Door system faults5
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail4
M8Technical failures above the Solebar4
I8Animal Strike or Incursion within the control of Network Rail3
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3
VHPassenger Communication cord, door egress or emergency train alarm operated3