Dunblane
728 delay minutes
The biggest share (27%) of the delay picked up at Dunblane in the four weeks to 9 December 2023 came from weather and structures.
57% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 89 | 12% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 127 | 17% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Weather and structures | 198 | 27% | 7% | 7 a day, more than 3 of the other 4 years | - |
| Autumn | 16 | 2% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 10 | 1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 84 | 11% | 17% | 3 a day, more than 2 of the other 4 years | 5 |
| The operators' causes | |||||
| Train faults | 116 | 16% | 16% | 4 a day, more than 3 of the other 4 years | 5 |
| Traincrew | 30 | 4% | 11% | 1 a day, more than 2 of the other 4 years | 9 |
| Stations | 8 | 1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 25 | 3% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 27 | 4% | 7% | 1 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 173 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 89 |
| IA | Signal failure (including no fault found) | 70 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 37 |
| ZU | No Cause Identified After investigation by both Parties | 31 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 21 |
| TH | (Senior) Conductor/Train Manager | 20 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 17 |
| MD | Technical failures below the solebar | 16 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 3,745 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,753 |
| ZU | No Cause Identified After investigation by both Parties | 1,549 |
| TG | Driver | 1,491 |
| MD | Technical failures below the solebar | 1,484 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,323 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,110 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,006 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 899 |
| M8 | Technical failures above the Solebar | 863 |