Leaves on the Line

Dunblane

DBL Scotland route
CSV JSON

728 delay minutes

The biggest share (27%) of the delay picked up at Dunblane in the four weeks to 9 December 2023 came from weather and structures.

57% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track8912%8% 3 a day, the most in 5 years-
Signals, points and power12717%16% 5 a day, more than 3 of the other 4 years-
Weather and structures19827%7% 7 a day, more than 3 of the other 4 years-
Autumn162%7% 1 a day, more than 1 of the other 4 years-
External101%4% 0 a day, more than 1 of the other 4 years-
Network management8411%17% 3 a day, more than 2 of the other 4 years5
The operators' causes
Train faults11616%16% 4 a day, more than 3 of the other 4 years5
Traincrew304%11% 1 a day, more than 2 of the other 4 years9
Stations81%3% 0 a day, more than 2 of the other 4 years-
Operations253%5% 1 a day, the most in 5 years-
Operator, other274%7% 1 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions173
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.89
IASignal failure (including no fault found)70
M0Confirmed train cab based safety system fault (including GSMR)37
ZUNo Cause Identified After investigation by both Parties31
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure21
TH(Senior) Conductor/Train Manager20
OCSignaller including mis-routing (not ERTM /ETCS related)17
MDTechnical failures below the solebar16
MPRail / wheel interface, adhesion problems (including ice on the running rail)16
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,745
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,753
ZUNo Cause Identified After investigation by both Parties1,549
TGDriver1,491
MDTechnical failures below the solebar1,484
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,323
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,110
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,006
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure899
M8Technical failures above the Solebar863