Dundee
2,474 delay minutes
The biggest share (18%) of the delay picked up at Dundee in the four weeks to 9 December 2023 came from signal, points and power faults.
54% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 119 | 5% | 8% | 4 a day, more than 3 of the other 4 years | 8 |
| Signals, points and power | 435 | 18% | 16% | 16 a day, the most in 5 years | 3 |
| Weather and structures | 430 | 17% | 7% | 15 a day, more than 2 of the other 4 years | 9 |
| Autumn | 181 | 7% | 7% | 6 a day, more than 2 of the other 4 years | - |
| External | 185 | 7% | 4% | 7 a day, the most in 5 years | 1 |
| Network management | 435 | 18% | 17% | 16 a day, more than 2 of the other 4 years | 35 |
| The operators' causes | |||||
| Train faults | 250 | 10% | 16% | 9 a day, more than 2 of the other 4 years | 17 |
| Traincrew | 158 | 6% | 11% | 6 a day, more than 2 of the other 4 years | 15 |
| Stations | 57 | 2% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 66 | 3% | 5% | 2 a day, more than 2 of the other 4 years | - |
| Operator, other | 160 | 6% | 7% | 6 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 300 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 270 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 146 |
| IC | Track circuit failure (including no fault found) | 139 |
| Q3 | NZ Pumps T | 130 |
| TG | Driver | 127 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 111 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 105 |
| IA | Signal failure (including no fault found) | 100 |
| XP | BRIDGE HIT | 99 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 16,854 |
| TG | Driver | 6,783 |
| MD | Technical failures below the solebar | 5,467 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 4,911 |
| M8 | Technical failures above the Solebar | 4,098 |
| IC | Track circuit failure (including no fault found) | 3,548 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,611 |
| IB | Points failure (including no fault found) | 2,579 |
| IA | Signal failure (including no fault found) | 2,552 |
| Q3 | NZ Pumps T | 2,427 |