Dunfermline Town
472 delay minutes
The biggest share (17%) of the delay picked up at Dunfermline Town in the four weeks to 9 December 2023 came from autumn leaves.
56% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 21 | 4% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 60 | 13% | 16% | 2 a day, the most in 5 years | - |
| Weather and structures | 39 | 8% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 78 | 17% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 41 | 9% | 4% | 1 a day, the most in 5 years | - |
| Network management | 68 | 14% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 50 | 11% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 17 | 4% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 40 | 8% | 3% | 1 a day, the most in 5 years | - |
| Operations | 16 | 3% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 42 | 9% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 42 |
| Q3 | NZ Pumps T | 39 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 37 |
| QH | Adhesion problems due to leaf contamination | 36 |
| II | Signalling lineside cable fault | 26 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 25 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 23 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 18 |
| XP | BRIDGE HIT | 18 |
| ZU | No Cause Identified After investigation by both Parties | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,642 |
| MD | Technical failures below the solebar | 1,564 |
| TG | Driver | 1,185 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,037 |
| Q3 | NZ Pumps T | 967 |
| IC | Track circuit failure (including no fault found) | 962 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 946 |
| M8 | Technical failures above the Solebar | 822 |
| RB | Passengers joining/alighting | 639 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 605 |