Durham
749 delay minutes
The biggest share (23%) of the delay picked up at Durham in the four weeks to 9 December 2023 came from weather and structures.
53% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | 5% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 34 | 5% | 16% | 1 a day, the least in 5 years | 1 |
| Weather and structures | 170 | 23% | 7% | 6 a day, more than 3 of the other 4 years | - |
| Autumn | 17 | 2% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 86 | 11% | 4% | 3 a day, the most in 5 years | - |
| Network management | 129 | 17% | 17% | 5 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 59 | 8% | 16% | 2 a day, the least in 5 years | - |
| Traincrew | 78 | 10% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 62 | 8% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 45 | 6% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 35 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 87 |
| XP | BRIDGE HIT | 76 |
| OU | Delays not Investigated by Network Rail | 66 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 62 |
| TH | (Senior) Conductor/Train Manager | 37 |
| TG | Driver | 34 |
| RB | Passengers joining/alighting | 33 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 26 |
| TR | Train Operating Company Directive | 21 |
| VB | Vandalism or theft | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,620 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 3,683 |
| IB | Points failure (including no fault found) | 3,128 |
| IC | Track circuit failure (including no fault found) | 2,400 |
| TG | Driver | 2,398 |
| MD | Technical failures below the solebar | 1,420 |
| I1 | Overhead line/third rail defect | 1,402 |
| MB | Electic Loco failure, defect, attention | 1,231 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,193 |
| M8 | Technical failures above the Solebar | 1,137 |