Leaves on the Line

Durham

DHM East Coast route
CSV JSON

749 delay minutes

The biggest share (23%) of the delay picked up at Durham in the four weeks to 9 December 2023 came from weather and structures.

53% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track365%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power345%16% 1 a day, the least in 5 years1
Weather and structures17023%7% 6 a day, more than 3 of the other 4 years-
Autumn172%7% 1 a day, more than 1 of the other 4 years-
External8611%4% 3 a day, the most in 5 years-
Network management12917%17% 5 a day, more than 2 of the other 4 years-
The operators' causes
Train faults598%16% 2 a day, the least in 5 years-
Traincrew7810%11% 3 a day, more than 2 of the other 4 years-
Stations628%3% 2 a day, more than 1 of the other 4 years-
Operations456%5% 2 a day, more than 3 of the other 4 years-
Operator, other355%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)87
XPBRIDGE HIT76
OUDelays not Investigated by Network Rail66
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail62
TH(Senior) Conductor/Train Manager37
TGDriver34
RBPassengers joining/alighting33
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.26
TRTrain Operating Company Directive21
VBVandalism or theft20
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.4,620
JATSR speed restrictions for track work outside of the Timetable Planning Rules3,683
IBPoints failure (including no fault found)3,128
ICTrack circuit failure (including no fault found)2,400
TGDriver2,398
MDTechnical failures below the solebar1,420
I1Overhead line/third rail defect1,402
MBElectic Loco failure, defect, attention1,231
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,193
M8Technical failures above the Solebar1,137