Dingwall
282 delay minutes
The biggest share (45%) of the delay picked up at Dingwall in the four weeks to 9 December 2023 came from faulty trains.
50% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | 1% | 8% | 0 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 78 | 28% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 9 | 3% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 13 | 5% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 36 | 13% | 17% | 1 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 127 | 45% | 16% | 5 a day, the most in 5 years | 4 |
| Traincrew | 5 | 2% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 3 | 1% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 9 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 114 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 49 |
| ZU | No Cause Identified After investigation by both Parties | 31 |
| JK | Flooding not due to exceptional weather | 16 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 13 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 13 |
| M9 | Reported fleet equipment defect - no fault found | 9 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 9 |
| Q3 | NZ Pumps T | 9 |
| M8 | Technical failures above the Solebar | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 2,408 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,963 |
| MD | Technical failures below the solebar | 1,859 |
| TG | Driver | 1,122 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 857 |
| IB | Points failure (including no fault found) | 772 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 712 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 625 |
| I0 | Telecom equipment legacy radio failures (RETB) | 611 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 592 |