282 delay minutes

The biggest share (45%) of the delay picked up at Dingwall in the four weeks to 9 December 2023 came from faulty trains.

50% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track31%8% 0 a day, more than 2 of the other 4 years1
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures7828%7% 3 a day, more than 3 of the other 4 years-
Autumn93%7% 0 a day, more than 1 of the other 4 years-
External135%4% 0 a day, more than 2 of the other 4 years-
Network management3613%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults12745%16% 5 a day, the most in 5 years4
Traincrew52%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations31%5% 0 a day, the most in 5 years-
Operator, other93%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar114
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)49
ZUNo Cause Identified After investigation by both Parties31
JKFlooding not due to exceptional weather16
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions13
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)13
M9Reported fleet equipment defect - no fault found9
MPRail / wheel interface, adhesion problems (including ice on the running rail)9
Q3NZ Pumps T9
M8Technical failures above the Solebar4
Since 2018
CodeWhat Network Rail loggedMinutes
ZUNo Cause Identified After investigation by both Parties2,408
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,963
MDTechnical failures below the solebar1,859
TGDriver1,122
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)857
IBPoints failure (including no fault found)772
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)712
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail625
I0Telecom equipment legacy radio failures (RETB)611
MPRail / wheel interface, adhesion problems (including ice on the running rail)592